place value within a ranking order that determines at the moment of decision which action is to be performed next, when several actions are requested simultaneously Note 1 to entry: The most important control functions acting on a process usually get the following sequence of priorities. Required control function | Priority | safeguarding | 1 | intervention | 2 | open-loop control | 3 | closed-loop control | 4 | optimizing | 5 |
In this table the control function with the lower number has the higher priority. Note 2 to entry: This entry was numbered 351-31-07 in IEC 60050-351:2006.
|