Area |
![](/icons/ecblank.gif) |
Generation, transmission and distribution of electrical energy – Dependability and quality of service of electric power systems / Outages of electric power systems equipment |
![](/icons/ecblank.gif) |
|
IEV ref |
![](/icons/ecblank.gif) |
692-04-07 |
![](/icons/ecblank.gif) |
|
en |
![](/icons/ecblank.gif) |
transient outage |
![](/icons/ecblank.gif) |
![](/icons/ecblank.gif) |
forced outage where the associated equipment is automatically returned to service within a specified time interval ![](/iev/iev.nsf/FiguresShared/692-fig4-en/$file/692-fig4-en.png)
Figure 4 – Outage relationships Note 1 to entry: The duration of that time interval is normally less than one minute. Note 2 to entry: A transient outage generally involves restoration by automatic means (protection schemes). |
![](/icons/ecblank.gif) |
|
fr |
![](/icons/ecblank.gif) |
indisponibilité transitoire, f |
![](/icons/ecblank.gif) |
![](/icons/ecblank.gif) |
indisponibilité non différable pour laquelle le matériel associé est remis automatiquement en service dans un intervalle de temps spécifié ![](/iev/iev.nsf/FiguresShared/692-fig4-fr/$file/692-fig4-fr.png)
Figure 4 – Relations entre indisponibilités Note 1 à l’article: La durée de cet intervalle de temps est normalement inférieure à une minute. Note 2 à l’article: Une indisponibilité transitoire implique généralement une remise en service automatique (programmes de protection). |
![](/icons/ecblank.gif) |
|
ar |
![](/icons/ecblank.gif) |
خروج عابر |
|
de |
![](/icons/ecblank.gif) |
vorübergehende Nichtverfügbarkeit, f |
|
es |
![](/icons/ecblank.gif) |
indisponibilidad transitoria |
|
ko |
![](/icons/ecblank.gif) |
과도 정지 |
|
ja |
![](/icons/ecblank.gif) |
瞬時停止 |
|
mn |
![](/icons/ecblank.gif) |
шилжилтийн тасралт |
|
pl |
![](/icons/ecblank.gif) |
wyłączenie przejściowe, n odstawienie przejściowe, n |
|
pt |
![](/icons/ecblank.gif) |
indisponibilidade transitória |
|
zh |
![](/icons/ecblank.gif) |
瞬时停运 |